The works essentially consist in:
- Construction of a system for the collection, treatment and discharge of rainwater falling on the free state-owned areas (paved or asphalted) of the territorial district of the Port System Authority of the Ionian Sea;
- Elimination of the existing civil waste water collection tanks in the eastern part of the port and construction of a system for conveying this waste water to the public sewage system;
- Construction of a drinking water supply network for existing and planned utilities in the eastern area of the port.
Expected results
Adaptation of plant networks to current regulation