Cementir Italia S.r.l. has a concession to load and discharge cement at Quay 4 (300 metres long with up to 12.5 metres draught) and on a 167 metre section of Pier 4 (east side). The terminal has an annual throughput of 400,000 to 500,000 tonnes.

The berth is linked to the nearby cement works by a mobile bridge and conveyor system capable of handling either 2,400 bags or 400 tonnes of clinker per hour.